Washington Union Station Main Hall Restoration Winner of 2017 DC Historic Preservation Award

hornickpreservationawards20170523-124.jpg

On May 23, the District of Columbia Office of Planning/Historic Preservation Office held its annual Awards for Excellence in Historic Preservation, naming the Washington Union Station Main Hall Restoration project the winner of its “State Historic Preservation Officer’s Award.”

In addition to recognizing McMullan & Associates, the award also cited the Union Station Redevelopment CorporationJones Lang LaSalle, Americas; and John Bowie Associates (historic architect). To learn more about this important initiative, please watch this video(Photo and video courtesy of the DC Preservation League)

Smithsonian National Zoo GBS Stabilization Winner of 2017 Exposing Excellence in Concrete Award by NCC ACI

SNZ GBS Finished Wall and Slope Overview.jpg

In May 2017, the National Capital Chapter of the American Concrete Institute (NCC ACI) has named the Smithsonian National Zoo – General Services Building Stabilization project as one of their 2017 “Exposing Excellence in Concrete” award winners. It was further commended by the NCC ACI that receiving one of this year’s awards was an accomplishment in light of their having received a total of 19 different project entries competing for recognition.

McMullan Receives Certificate of Appreciation from National Park Service for Burnside Bridge Restoration

Burnside Bridge_CertificateofAppreciation.jpg

In May 2017, McMullan & Associations, Inc. received a formal “Certificate of Appreciation” from the National Park Service (NPS) in recognition of our “exceptional support for the restoration of the historic Burnside Bridge, preserving this national treasure for present day and future generations.” The certificate was signed by NPS Superintendent Susan Trail.

McMullan worked with the National Park Service to faithfully restore one of the most well-known Civil War bridges to its original condition, which had suffered from stone fallout and water damage. The beautifully proportioned 192-foot bridge runs over the Antietam Creek in Sharpsburg, MD, and is part of the Antietam National Battlefield Park. In September 1862, this park was the battleground where nearly five thousand Americans lost their lives.

McMullan & Associates, Inc. Welcomes Andrea C. Fitch as Director of MarCom/BD

ACFAnnouncement_Option5.jpg

Andrea brings forward a level of strategic marcom and business development deeply rooted in the CRE market. Her ability to leverage a vast network of contacts with forecasting market trends enables her to be a key advisor in building lasting partnerships and successful teams. Her industry involvement includes serving as Past SMPS National President and on committees for CoreNet Global Mid-Atlantic Chapter and NAIOP Northern Virginia Chapter. She is also a CoreNet Global Luminary Award recipient for co-presenting on workspace futures. Andrea can be reached at afitch@mcmse.com.

Union Station Seismic Repairs to Vaulted Plaster Ceiling Winner of 2017 WBC Craftsmanship & Star Awards

Winterbottom Union Station CROPPED.jpg

In March 2017, the Washington Building Congress awarded both Hayles and Howe, Inc. and Norwood Environmental Systems each with a Craftsmanship Award in their respective categories of Plaster and HVAC-Sheet Metal.

In addition, the WBC Craftsmanship Award Judges conveyed the highly coveted Star Award for Excellence in the Face of Adversity to Hayles and Howe for their exceptional work in the execution of solutions used to restore and stabilize the damaged ceiling in the main hall of Union Station. It was noted, that the supporting structure of the glorious coffered ceiling was weakened by the 2011 earthquake. Pieces of the ceiling began to break and fall into the main hall of the train station. Technical excellence was represented by the way the Hayles and Howe craftsmen worked with structural engineers and architects to create seismic bracing to protect the ceiling from future earthquake damage. The difficulty of execution in this project was to repair the enormous ceiling in the main hall without shutting the station down. In order to keep the patrons safe from the work going on above them, Hayles and Howe built an enclosure around the scaffolding. Quality of craftsmanship was found in the precision applied to the repair of each damaged coffer. With these techniques the historic ceiling was returned to its original splendor.

Additional Project Team Members include Construction Manager–Jones Lang LaSalle; Architects–Gensler and John Bowie Associates; and MEP Engineer– GHT Ltd.